Notice:The English translation of this caption is only for reference.
A detailed description of this caption is in Chinese.
In case of any discrepancies between the Chinese and the English,
the Chinese version will be the standard.
|
Reached double-track railway opened in June 2009 (2)
9/25/2008 7:10:31 PM
A speeding train in the railway reached a two-on;
|
A speeding train at the railway reached a two-on;
| | |
Image Description:
September 25, 2008, to reach the capacity expansion of the railway renovation project, two rows of the tracks have been exposed Fang Rong, next to a train passing through the city of Nanchong in Sichuan Gaoping Long small area. It is understood that to achieve the capacity expansion of the railway reconstruction project a total length of 308 km, of which 116 km territory of Nanchong in Sichuan Province. According to the Chengdu Railway Administration to reach the railway construction headquarters and Capacity Expansion, as a "11th Five-Year Plan" key project during the construction project to reach the double-track railway, upon completion, will be an electrified railway, the design of Nanchong Section 160 kilometers per hour and is expected to be across the board June 30, 2009 opening.
|
|
|
|
|
|