Notice:The English translation of this caption is only for reference. A detailed description of this caption is in Chinese. In case of any discrepancies between the Chinese and the English, the Chinese version will be the standard.

 
Shenzhen Bay Bridge Construction, Bridge construction, Shenzhen and Hong Kong building, Regional Economic Development, Urban construction, Shenzhen, Guangdong Province
Image code: 071229011b
Image title: Shenzhen Bay Bridge Course (19)
Image Description: Shenzhen Bay Bridge, from East Point on the Shenzhen side of the first line at the reclamation area, linking Shekou, Shenzhen and Hong Kong Tung Tau Kok Yuen Long Ao Shi Kan, a Hong Kong-Shenzhen Western Corridor between the Mainland and Hong Kong is also building the first four land crossings. Channel major projects including the Shenzhen Bay Bridge, lane overpass and converted at the forefront of three parts. SBB 4770 m long, six lane highway using two-way standards. According to the standard highway design, traffic design speed of 100 km bridge Miankuan 33.1 meters for the six two-way lanes on both sides of Jinjitingchedai increase. Shenzhen side 1,238 m long bridge, Road interchange ramp for 2,224 meters long. Bridge located south and north two shipping mouth with a main span of 210 meters and 180 meters single-tower cable-stayed bridge steel girder programme. Hole non-navigable by 75 meters, and other cross-section box girder. In order to improve traffic conditions, increase bridge landscape effect, a bridge axis S-shaped plane. Shenzhen Bay Bridge non-navigable hole of the cantilever assembly-beam construction in this country prior to the first, and its erection work to a successful conclusion, but also record the history of the construction of a bridge and many Chinese history. Shenzhen Bay Bridge and the construction of the Western Corridor opened reflects the practice of one country, two systems, and the Shenzhen-Hong Kong cooperation. According to the agreement between Hong Kong and Guangdong, Shenzhen side of the bridge after the completion of the terminal ports of Hong Kong and Shenzhen side of the bridge all by the Hong Kong side management, the Shenzhen Port entered the Hong Kong side of the terminal is to enter Hong Kong. It is understood that the Bay Bridge and the Shenzhen Western Corridor was the 10th anniversary of the return of Hong Kong on July 1, 2007 at the opening ceremony, Chinese President Hu Jintao personally cut the ribbon.
Keywords: Shenzhen Bay Bridge Construction , Bridge construction , Shenzhen and Hong Kong building , Regional Economic Development
Subject/Category: Urban construction
Photograher: Wangqiangzhong
People:
Place: Shenzhen, Guangdong Province
Date created: 12/29/2007 2:24:36 AM
Max file size: 759.22KB
Dimension: 3008 x 2000
Price: middle size price $18.00 / large size price $30.00

About Us | Terms & Conditions | Private Policy | Contact Us | Site Map

Sponsored by China News Service, General Planner: Wang Yao, Winner of World Press Photo Award

Copyright @ 2007 CNSImages.com. All rights reserved. Reproduction in whole or in part without permission is prohibited.

Message center